| HOME | Barrier Motors, Bellevue, WA |

Located in downtown Bellevue, this 180' x 240' three-level parking structure stores automobile inventory for Barrier Motors.
This garage utilizes the typical "all precast" structural system. The exterior frame consists of precast beam/column units, precast spandrels, and cast-in-place shear walls. Interior framing consists of precast columns, supporting prestressed inverted tee beams. The floor deck uses 24" deep prestressed double tees, with a cast-in-place composite topping.
Floor Deck; 148 pcs. - 24" x 10'-0" x 58' long Double Tees
Framing;

Accelerated Construction Schedule- Precast components were fabricated concurrently with site and foundation work.
Efficient System- Utilizes precast components for vertical load support, and the cast-in-place topping as a diaphragm, transfering the wind/seismic loads into the cast-in-place shear walls. The cast-in-place topping also increases double tee capacity through composite action, and is finished to provide proper drainage.
| Owner | Barrier Motors Inc. |
| Designer | Engineers Northwest, Inc. |
| General Contractor | Foushee & Associates |
| Precaster | Concrete Technology Corporation, Tacoma, Washington |